4.1.2.1 2 Maintenance Levels of Service

Maintenance Levels of Service / Washington State DOT

When seeking to establish the connection between investments and performance across a wide range of assets or roadway attributes such as litter, vegetation height, drainage, or functionality it is helpful to relate all of the various measures of performance to a common rating scale. Washington State DOT has developed its Maintenance Accountability Process to establish the relationship between maintenance level of effort and the resulting level of service. The process rates conditions and services in seven areas using a common letter-grade system, or MLOS.

  • Roadway Maintenance & Operations.
  • Drainage Maintenance & Slope Repair.
  • Roadside and Vegetation Management.
  • Bridge & Urban Tunnel Maintenance and Operations.
  • Snow & Ice Control Operations.
  • Traffic Control Maintenance & Operations.
  • Rest Area Operations.

Each group of services or conditions includes several performance measures, which are translated to the MLOS grades of “A” (highest performance), “B”, “C” (adequate performance), “D” or “F” (unacceptable performance). Applying the MLOS grades allows for a consistent means of rating performance across services and geographic regions. Letter grades can also be represented in photographs of facilities that meet the criteria for each condition state to support communications with stakeholder groups. The MLOS are outcome-based measures that allow the agency to predict the expected level of service that can be achieved based on anticipated budget and work planning decisions. By tracking maintenance expenditures and MLOS results annually, Washington State DOT is able to adjust its maintenance priorities and budgets to address system needs and stakeholder wants.

Source: https://www.wsdot.wa.gov/Maintenance/Accountability/


Read more in the chapter: 4.1.2 Defining Asset Service and Performance Levels